Skip to content

D029 - Tough times never last - Dashboard

Sale price$13.00 CAD

Size:
Size Chart

Feel free to send us a photo of your planner rings to confirm the sizing. Hello@8lotus.co 

 

Size MM In Style Spacing (mm)**
A5 148 x 210 6 Rings 19 / 70
Personal 95 x 171
6 Rings
19 / 50
Pocket 81 x 120
6 Rings
19 / 19
A6 105 x 148 6 Rings 19 / 38
Half Letter 139.7 x 215.9 5.5 x 8.5 8 Discs Standard
Mini HP 117.5 x 177.8 4.625 x 7 7 Discs Standard
Personal Wide 121 x 171 4.74 x 6.74
6 Rings
19 / 50
FC Compact 108 x 171 4.25 x 6.74
6 Rings
19 / 50
B6 5 x 7
6 Rings
Classic HP 7 x 9.25 9 Discs Standard

 

Louis Vuitton Agendas

  • Large / GM Agenda: A5 size inserts
  • Medium / MM Agenda: Personal size inserts
  • Small / PM Agenda: Pocket size inserts 

 

Spacing

**Measurements are of the distance between each ring and each set of rings. Most ring planners will have two sets of three rings. Each of the three rings in one set are 19mm apart. The distance between the two set of rings will vary. For example, personal rings have a distance of 50mm between the two set of three rings. A5 have a distance of 70mm between the two set of three rings.

 

A6

 

  • For A6 Planner cover owners, please double check your ring size. There are many imported planner covers from China labeled as A6 but are actually personal size. The reason for this is that in China, the actual A6 size is called “奇葩 A6 (weird/odd A6?)” and “A6” is used for personal size. Confusing indeed since A6 is an international paper size! 

  • Our A6 inserts are a true to size (105 x 148mm) and will only fit in an actual A6 planner cover. For examples of true A6 planners, see A6 planner covers from Mulberry, VanDerSpek and Gillio Firenze. Ring spacing: 38mm between the 2 set of 3 rings.

 

Where to Purchase Planner Covers?

Size

Material:

Material

  • Tough times never last. But tough people do. 
  • Planner Dashboard
  • Design Reference: D029
  • Choose your dashboard material

Handmade in our Studio

D029 - Tough times never last - Dashboard
D029 - Tough times never last - Dashboard Sale price$13.00 CAD