Skip to content

D029 - Tough times never last - Dashboard

Sale price£8.00 GBP

Size:
Planner Inserts Size Chart

If you would like us to assist in confirming the size of your planner, please us a photo of your planner rings next to a ruler to hello@8lotus.co 

 

Size MM In Style Ring Spacing mm  Ring Set Spacing mm 
A5 148 x 210 5.82 x 8.26  6 Rings 19  70
Personal 95 x 171 3.74 x 6.73
6 Rings
19  50
Pocket 81 x 120 3.18 x 4.72
6 Rings
19  19
A6 105 x 148 4.13 x 5.82 6 Rings 19  38
Half Letter 139.7 x 215.9 5.5 x 8.5 8 Discs
Mini HP 117.5 x 177.8 4.625 x 7 7 Discs
Personal Wide 120.65 x 171.45 4.75 x 6.75
6 Rings
19  50
FC Compact (Franklin Planner) 108 x 171.45 4.25 x 6.75
6 Rings
19  50
B6 127 x 118 5 x 7
6 Rings
19 50
Classic HP 177.8 x 234 7 x 9.25 9 Discs

  

Louis Vuitton Agendas

  • Large / GM Agenda: A5 size inserts
  • Medium / MM Agenda: Personal size inserts
  • Small / PM Agenda: Pocket size inserts 

 

Spacing

**Measurements are of the distance between each ring and each set of rings. Most ring planners will have two sets of three rings. Each of the three rings in one set are 19mm apart. The distance between the two set of rings will vary. For example, personal rings have a distance of 50mm between the two set of three rings. A5 have a distance of 70mm between the two set of three rings.

 

A6

 

  • For A6 Planner cover owners, please double check your ring size. There are many imported planner covers from China labeled as A6 but are actually personal size. The reason for this is that in China, the actual A6 size is called “奇葩 A6 (weird/odd A6?)” and “A6” is used for personal size. Confusing indeed since A6 is an international paper size! 

  • Our A6 inserts are a true to size (105 x 148mm) and will only fit in an actual A6 planner cover. For examples of true A6 planners, see A6 planner covers from Mulberry, VanDerSpek and Gillio Firenze. Ring spacing: 38mm between the 2 set of 3 rings.

 

Where to Purchase Planner Covers?

 

Size

Material:

Material

Handmade in our Studio

D029 - Tough times never last - Dashboard
D029 - Tough times never last - Dashboard Sale price£8.00 GBP