
D029 - Tough times never last - Dashboard
- Tough times never last. But tough people do.
- Planner Dashboard
- Design Reference: D029
Dashboards
Material Options
- Matte Plastic: This thin, translucent material brings a luxurious finish to your planner set up without adding bulk. Layering is a dream as there is no visible paper fibers. This material will have a consistent look throughout and there are no black or brown dots that may appear in our other translucent materials.
- Cloud Vellum: This beautiful cloudy white material is a less translucent layering choice. This materials contains fibers that may appear as brown or black dots.
- Translucent Vellum: If you prefer a paper feel for you dashboards, this is an alternative to our matte plastic material that offers a similar translucent feel. This materials contains fibers that may appear as brown or black dots. 135GSM.
- Medium Weight Card Stock: These stunning 110-135lb card stocks comes in a variety of textures and adds protection to the writing paper inside.
Finishing: Pre-punched 6 hole for ring planners (Pocket, A6, Personal, Personal Wide, A5). Pre-punched for disc-bound planners (Half Letter, Mini HP)
Disclaimer: Please note that due to the handmade nature of our products, you may find minor differences in print, color, hole punching and size from batch to batch. These variations will not hinder the use and fit of these products.
Warranty: All 8LOTUS brand products are covered with a 1 year warranty for any manufacturing defects.
Shipping & Returns
For information regarding our shipping & returns, please review our full store policy before placing your order.
Choose options

D029 - Tough times never last - Dashboard
Sale price$16.00 AUD