Skip to content

Printable PDF

This is a digital product. No physical products will be sent.

MN020 - Project Planner - PDF

Sale price$5.98 USD

Size:
Planner Inserts Size Chart
If you would like us to assist in confirming the size of your planner, please us a photo of your planner with the rings visible to hello@8lotus.co Samples can also be ordered here.

 

Size MM In Punch Style Ring Spacing mm  Ring Set Spacing mm 
A5 148 x 210 5.82 x 8.26  6 Rings 19  70
Personal 95 x 171 3.74 x 6.73
6 Rings
19  50
Pocket 81 x 120 3.18 x 4.72
6 Rings
19  19
A6 105 x 148 4.13 x 5.82 6 Rings 19  38
Half Letter 139.7 x 215.9 5.5 x 8.5 8 Discs
Mini HP 117.5 x 177.8 4.625 x 7 7 Discs
Personal Wide 120.65 x 171.45 4.75 x 6.75
6 Rings
19  50
FC Compact 108 x 171.45 4.25 x 6.75
6 Rings
19  50
B6 127 x 118 5 x 7
6 Rings
19 50
Classic HP 177.8 x 234 7 x 9.25 9 Discs

  

Louis Vuitton Agendas

  • Large / GM Agenda: A5 size inserts
  • Medium / MM Agenda: Personal size inserts
  • Small / PM Agenda: Pocket size inserts 

 

Spacing

**Measurements are of the distance between each ring and each set of rings. Most ring planners will have two sets of three rings. Each of the three rings in one set are 19mm apart. The distance between the two set of rings will vary. For example, personal rings have a distance of 50mm between the two set of three rings. A5 have a distance of 70mm between the two set of three rings.

 

A6

  • For A6 Planner cover owners, please double-check your ring size. There are many imported planner covers from China (especially on Amazon) labeled as A6 but are actually personal size. The reason for this is that in China, the actual A6 size is called “奇葩 A6 (weird/odd A6?)” and “A6” is used for personal size. Confusing indeed since A6 is an international paper size (from the same system as A1, A2, A3, A4 etc).

  • Our A6 inserts are a true to size (105 x 148mm) and will only fit in an actual A6 planner cover. For examples of true A6 planners, see A6 planner covers from Mulberry, VanDerSpek and Gillio Firenze. Ring spacing: 38mm or 1.5 in between the 2 set of 3 rings.

  • A6 size is NOT personal size. The personal size measures 91 x 171 mm and was first introduced by Filofax in 1930.

 

Where to Purchase Planner Covers?

 


Size

Printable PDF

This is a digital product.

Minimal design elements, productivity tools, project planner printable inserts.

  • Digital PDF Files
  • Design Ref: MN020
MN020 - Project Planner - PDF
MN020 - Project Planner - PDF Sale price$5.98 USD